top of page
MENU
Social Housing Development Project
Deliverables
1. Design Support, Coordination, BOQs and GFCs
2. LOD 300-500 BIM Model
3. Reducing onsite material wastage.by creating clash free coordinated Shop Drawings.
4. Reducing construction time by preventing rework on site and removing communication gaps between the stakeholders.
5. Making facility management easier post-construction by creating an As-Built LOD 500 BIM Model.
Location
Mumbai, India
Type
Residential
Client
Capacite Infa Projects Limited
bottom of page