top of page

Social Housing Development Project

Deliverables

1. Design Support, Coordination, BOQs and GFCs

2. LOD 300-500 BIM Model

3. Reducing onsite material wastage.by creating clash free coordinated Shop Drawings.

4. Reducing construction time by preventing rework on site and removing communication gaps between the stakeholders.

5. Making facility management easier post-construction by creating an As-Built LOD 500 BIM Model.

Location

Mumbai, India

Type

Residential

Client

Capacite Infa Projects Limited

bottom of page